Wireline Logging Equipment

Wireline Logging Equipment

Visit website
Industrial

High Temperature Composite System

Wireline logging equipment has to stand up to the full spectrum of underground environments and overcome differential sticking, allowing you to log at extreme deviations, running smoothly without holdup, ensuring quality data and enhancing sample recovery.

C-Tech has worked closely with Petromac to develop composite parts that work with their systems.

challenges

CHALLENGE #001

High Temperature and Abrasion Resistance

Petromac required a non-metal guide component that could retain its structural integrity and low friction coefficient under high temperatures, high pressures and be subjected to abrasion through underground wells.

S O L U T I O N

C-Tech worked with Petromac and carried out R&D on a number of specialised high temperature prepreg materials. The end solution has been integrated and bonded to parts with a high temperature epoxy glue.

Fun Facts:

Maximum depth = 9.7km (32,055ft)

Successful descents = 92%

Maximum wellbore temperature = 180°

CHALLENGE #002

Composite Spring

Springs are used in wireline systems and are subjected to extreme deflection under high loads. The steel springs were yielding before reaching maximum deflection causing failure of the system.

S O L U T I O N

C-Tech designed and built a composite spring using technology from other products. We were able to make the most of carbon fibre stiffness and S-Glass elongation. The challenge was integrating these with a high temperature resin system to stand up to the operating environment.

Next Project

How it works

Creating your custom order is easy. Our team works with you to develop and meet your precise design and performance specifications.

Enquire
01.
Get in touch

Tell us more about your idea or vision in our easy-to-fill online form.

02.
Choose your specs

Our technical experts will scope out the needs, requirement and specs for your project.

03.
Finalise your quote

Once you’ve confirmed on your bespoke solution, we’ll create a competitive quote.

04.
Start production

After you’ve confirmed your quote, we’ll begin to manufacture your product. This typically takes X weeks but may be longer depending on your requirements.

05.
Get in touch

We generally ship orders within 10-15 business days within New Zealand.
See International Shipping +

Stay up to speed on the latest at C-Tech